CEmpresas

Compañía Minera Barrick Chile Ltda.

COMPAÑÍA MINERA BARRICK CHILE LTDA.

RUT/ID NUMBER: 59.000.710-2

www.barricksudamerica.com

 

La Compañía

Compañía Minera Barrick Chile Ltda., es propiedad de Barrick Gold Corporation, productor senior de oro. Barrick se instaló en Chile en 2006 con la compra de El Indio y el entonces proyecto Nevada -que más tarde pasó a llamarse Pascua-Lama- a través de la compra de Lac Minerals. Durante 2006, Barrick adquirió a Placer Dome la mina de cobre Zaldívar, ubicada en la Región de Antofagasta, Chile. En diciembre de 2007, gracias a la adquisición de Arizona Star, Barrick además sumó el 50% de Cerro Casale, mientras Kinross Gold Corporation se quedó con el otro 50%. En febrero de 2010, Barrick adquirió un 25% adicional de su socio (Kinross) en este proyecto, con lo cual obtuvo el control del 75% de Cerro Casale.

Cerro Casale está ubicada en la región de Atacama, provincia de Copiapó, específicamente en la comuna de Tierra Amarilla, a 145 km al sureste de la capital regional. El proyecto consiste en la operación de una mina a rajo abierto principalmente de oro, estimándose reservas de alrededor de 23, 2 millones de onzas de oro y 5,8 millones de libras de cobre. No se consideran en estas cifras otros yacimientos satélites, también de propiedad de la compañía.

Además, Barrick posee el 100% del yacimiento Pascua-Lama, cuyas reservas comprobadas se estiman en 15,4 millones de onzas de oro, y más de 674 millones de onzas de plata. Éste es el primer proyecto binacional del mundo. Está ubicado a más de 4.000 metros de altura en la alta cordillera de Los Andes, en la frontera de Chile con Argentina, en la región de Atacama. El proyecto obtuvo su RCA en 2001 y 2006. Posteriormente, la fuerte oposición de algunas comunidades obligó a la empresa a suspender sus actividades. En octubre de 2015, Sernageomin aprobó el Cierre Temporal y Parcial de las faenas. Actualmente, la compañía trabaja en la optimización del proyecto, de manera tal, que sea sustentable desde las perspectivas financiera, social y ambiental.
Durante el primer trimestre del 2015, Barrick anunció el descubrimiento de un nuevo yacimiento de oro en la región de los Andes: Alturas. Está ubicado específicamente a 130 kilómetros en línea recta desde La Serena, en la subcuenca del río Turbio. Asimismo, a fines de julio de 2015, Barrick Gold anunció la venta del 50% de su mina de cobre Zaldívar por unos U$S 1.000 millones al Grupo Antofagasta Plc, el cual asumió la operación del yacimiento.

 

The Company

Compañia Minera Barrick Chile Ltda. is owned by the Barrick Gold Corporation, senior producer of gold. Barrick arrived in Chile in 2006 with the purchase of El Indio and the then Nevada project –which later became Pascua-Lama– through the purchase of Lac Minerals. In 2006, Barrick acquired from Placer Dome the Zaldivar copper mine, located in the Antofagasta Region. In December 2007, thanks to the acquisition of Arizona Star, Barrick also added 50% of Cerro Casale, while Kinross Gold Corporation obtained the remaining 50%. In February 2010, Barrick acquired an additional 25% from its partner (Kinross) in this project, which made it a 75% owner of Cerro Casale.

Cerro Casale is located in the Atacama Region, Copiapo province, specifically in the Tierra Amarilla commune, 145 km southeast of the regional capital. The project consists of the operation of an open-pit mine, mainly of gold, with estimated reserves of about 23.2 million ounces of gold and 5.8 million pounds of copper. These numbers don’t consider other satellite deposits, also owned by the company.
Additionally, Barrick owns 100%of the Pascua-Lama deposit, which proven reserves are estimated in 15.4 million ounces of gold, and more than 674 million ounces of gold. This is the first binational project in the world. It is located more than 4,000 meters high in the Andes, in the Chilean-Argentinean border, in the Atacama Region. The project obtained its RCA in 2001 and 2006. Subsequently, the strong opposition from some communities forced the company to stop its activities. In October 2015, Sernageomin approved the Pascua-Lama Partial Temporary Closure of the works. Currently, the company is working on the project’s optimization, in order to make it sustainable, from the financial, social and environmental perspective.

During the first quarter of 2015, Barrick announced the discovery of a new and important gold deposit in the Andes Region: Alturas. It is located specifically 130 km in a straight line from La Serena in the sub-basin of the Turbio River.

Likewise, in late July 2015, Barrick Gold announced the sale of 50% of its Zaldivar copper mine for about US$1 billion to the Antofagasta Plc Group, which will take control of the deposit’s operation.

 

Aspectos Corporativos/Corporate Aspects

Tipo de Empresa/Type of Company: Privada de exploración y explotación/Private exploration and exploitation

Tipo de Minería/Mining Field:Cobre, Oro y Plata/Copper, Gold and Silver

Yacimientos en Chile – Faenas/Ore Deposits – Mine Sites in Chile: Proyecto Pascua-Lama, Proyecto Cerro Casale / Pascua-Lama Project, Cerro Casale Project (25/75 Kinross/Barrick), El Indio (cerrada/ closed) y/andZaldívar (50%).

Propiedad/Ownership: Barrick Gold Corporation/Barrick Gold Corporation.

 

Principales Ejecutivos/Main Executives

Presidente BarrickGold/President Barrick Gold:
Kelvin Dushnisky

Director Ejecutivo Barrick Chile/Executive Director Barrick Chile:
René Muga E.

Director Proyectos Barrick Chile / Projects Director Barrick Chile:
Sergio Fuentes S.

Director de Finanzas y CFO/Finance Director and CFO:
Cody Whipperman

Director Exploraciones/Explorations Director:
Raúl Guerra

 

Contact/Contact

Dirección/Address: Avda. Ricardo Lyon 222, Piso 8, Providencia, Santiago, Región Metropolitana (RM)/Metropolitan Region
Teléfono/Phone:(56) 2 2340 2022 – Fax: (56) 2 2340 2062
E-Mail:comunicacionesbcl@barrick.com

Artículos relacionados

Close